New Zealand Window Replacements: H1 Scope and Quote Setup

Replacing Windows in New Zealand: H1 Scope and Preparing a Useful Quote

How New Zealand Building Code Clause H1 applies to window replacements and extensions, and what to put in your supplier RFQ.

A newly fitted aluminium sash in an older weatherboard home facing a green garden.
Answer in brief

New Zealand Window Replacements: H1 Scope and Quote Preparation

Before locking in thermal specs for a New Zealand window order, classify the job: minor replacement, major envelope work, or new build. H1/AS1 sixth edition gives generic construction values of R0.24 for standard aluminium and R0.30 for thermally broken aluminium using double glazing at Ug 2.9 W/(m²·K). Those figures apply strictly to those reference assemblies.

Match the assessment route to the scope of work

WorkUse this assessmentConsequence for the order
Small existing-window replacementCompare the altered building's performance with its existing conditionEvaluate the replacement frame, glass and air sealing together
Large part of the thermal envelope replacedTreat the scope similarly to an addition under MBIE guidanceSet construction R-values through the applicable design assessment
New extension or window cut into a wallApply H1 to the new construction and check the altered buildingInclude glazing area and the surrounding envelope in the calculation

Pair construction R-values with exact frame and glass specs

In the H1/AS1 sixth-edition reference row with glazing Ug 2.9 W/(m²·K), the timber-frame construction value is R0.41 and the aluminium-frame value is R0.24 m²·K/W. The frame choice changes the construction result even within the same glazing row.

Stick to Appendix D's scope and method when applying these generic values to housing. Your window schedule needs to state both the frame type and the center-of-glass Ug value behind every target construction R-value. MBIE Building Performance

Assess the building after a small replacement

MBIE's repair guidance looks at the existing building's net thermal performance. A slight drop in R-value can pass in narrow cases—such as when like-for-like profiles aren't available, or where tighter air seals offset the lower frame resistance.

When swapping timber frames for aluminium, document both the existing assembly and the proposed complete window, including the perimeter seal detail. That accounts for the conductive shift in the frame alongside the air leakage path around it. MBIE Building Performance

Three blocks identify opening changes, surrounding work and project records for scope review.

Include new openings in the envelope calculation

Cutting a new window into an insulated wall trades high-R wall area for lower-R glazing. Log both areas in the heat-loss model. For extensions, treat all new roof, wall, floor, and window elements as new construction.

Under MBIE rules, new work must meet H1, and the altered building cannot end up less compliant than it started. State the exact Acceptable Solution or Verification Method and its edition in the design documentation. MBIE guidance still permits the specified older Schedule methods up to 26 November 2026. MBIE Building Performance

Photos, drawings and proposed product details are assembled for a project adviser to review.

Put the thermal targets directly on the production schedule

List the required construction R-value right next to the window mark, overall frame width and height, configuration, and quantity. Attach the designer's frame-and-glass calculation or the specific generic table reference.

On combination units with a fixed lite beside an operable sash, call out the glass areas and frame profiles separately. If a supplier quotes an alternative profile or split that changes those ratios, re-run the thermal calculation before signing off on fabrication.

Next steps for your window and door project

Dimensions, loads and building standards

Get a Quote

Send over your window schedule, floor plans, rough sizes, or project notes. We'll come back to you with practical advice on profiles, glass, hardware, finishes, and export crating.

YULUX chat

AI assistant · Human support
⋯

AI guide only—our team confirms final pricing. ·

I'm an AI assistant, not a person, so please don't share confidential details. Double-check any answers or search links—I can't lock in prices, agency terms, or contracts. This chat stays in your browser tab and server memory temporarily, and wipes after 30 minutes of inactivity. Privacy policy

Hi, I’m the YULUX AI assistant. Ask me about our products, window and door systems, or working together.