EN 14351-1 CE Marking for Imported Windows

Check an imported window order against its DoP, CE label, type assessment, production controls and importer fields, with EU transition and GB/NI guidance.

An unmarked aluminium window sample and a plain closed technical dossier on a bench.
Answer in brief

EN 14351-1 CE Marking for Imported Windows

An ordinary external window covered by EN 14351-1 needs a matching Declaration of Performance and CE information. The European Aluminium/FAECF Class 4 example states air permeability at 100 Pa with a maximum test pressure of 600 Pa, so the declared class must retain its test conditions.

The details behind the answer

Under the legacy CPR 2011 route, the manufacturer keeps the technical documentation and DoP for 10 years after market placement. Declaration example CPR 2011, Article 11

Which windows fall under EN 14351-1?

EN 14351-1:2006+A2:2016 covers windows and external pedestrian doorsets, including the associated hardware, weatherstripping and glazing within its scope. Begin the purchase specification with the opening arrangement and intended use, then identify the applicable harmonised standard, or hEN. EVS published standard scope

For ordinary non-fire windows, AVCP System 3 combines notified-laboratory type assessment with manufacturer-controlled production. NSAI separates the manufacturer’s System 3 laboratory reports and factory production control records from System 1 product certification. NSAI surveillance guidance, Table 1

Fire-resisting or smoke-control openable windows and external doorsets require the EN 16034:2014 route alongside EN 14351-1:2006+A2:2016 where covered. A fire-rated opening therefore needs its fire/smoke performance addressed explicitly in the procurement package. DIBt fire and smoke closure guidance

From 1 July 2013, the CPR 2011 provisions governing declarations, CE marking and economic-operator duties applied in EU Member States. For covered windows, this brought the manufacturer’s DoP and CE obligations together with importer checks before EU market placement, subject to applicable statutory derogations. CPR 2011, Articles 4–9, 13 and 68

What must match before an ordinary window order is accepted?

The declaration and CE label must identify the supplied opening mechanism, glazing and size range. A tilt-turn assessment cannot support an unexplained substitution to a sliding sash. DIBt's checklist includes manufacturer identity, product type, DoP reference, declared performance, dated specification, intended use and the applicable notified-body identification. DIBt CE checklist

The CE fields follow DIBt’s legacy-CPR checklist. The DoP and label can share a document when all required information is supplied. DIBt CE marking checklist European Aluminium and FAECF guidance, section 5

Under Article 13(3), packaging or an accompanying document may carry the importer’s identification when marking the product is impossible. Article 13 also requires the importer to ensure that assessment, documentation and marking obligations have been fulfilled. CPR 2011 importer obligations

For shared or cascading assessment evidence, the manufacturer needs authorised use and correspondence between the tested construction and the supplied product. FPC records help establish that correspondence. European Aluminium and FAECF guidance, section 3

Match an ordinary external window to its declaration. Intended use: Identify the dated EN 14351-1 reference for external windows; Product type: Match the DoP and label to the ordered construction; Declared performance: Compare the declaration with the project specification.
IMAGE NOTE

Match an ordinary external window to its declaration

How does the 2026 CPR transition affect a purchase?

Regulation (EU) 2024/3110 generally applies from 8 January 2026, while legacy-standard products continue under the applicable CPR 2011 declaration, marking and AVCP provisions during transition. The German official contact point explains that the new declaration of performance and conformity, or DoPC, and Assessment and Verification Systems, or AVS, follow coverage under the new framework. Official explanation of parallel CPR regimes CPR 2024, Article 96

Does the same marking package work for Great Britain and Northern Ireland?

As checked on 11 November 2026, UK government construction-product guidance says CE marking remains available for Great Britain, comprising England, Scotland and Wales. UKCA is also available under the applicable GB route. Allocate the destination before booking the assessment work. UK government guidance for Great Britain

For Northern Ireland, the government specifies CE marking with an EU-recognised notified body, or CE plus UK(NI) when the required third-party assessment uses a UK approved body. EU market access requires the EU-recognised assessment route. A distributor supplying both markets should allocate documentation and stock by destination. UK government guidance for Northern Ireland

Reading a GB/T 7106-2019 air result. Reference pressure: Classification leakage is calculated at 10 Pa; Joint length: Read leakage per unit length; Specimen area: Read leakage per unit area separately.
IMAGE NOTE

Reading a GB/T 7106-2019 air result

Can a Chinese air-test report support the same declaration?

GB/T 7106-2019 calculates classification leakage at 10 Pa, using opening-joint length and specimen area as separate reporting bases. Its clauses 7.4.1.1.3–7.4.1.2.2 also evaluate the adverse result across three specimens and treat pressure directions separately. The official catalogue identifies the standard and test scope. SAMR standard record

Translate the leakage units, specimen dimensions and pressure directions alongside the Chinese result before assigning the European air-permeability class. The Chinese 10 Pa classification and the European example in the opening use different reference conditions. European Aluminium/FAECF guidance

Would you accept this shipment package or seek a correction?

Assumptions: an ordinary external tilt-turn order has a maximum whole-window Uw of 1.4 W/(m²·K). Its matching DoP declares 1.3 W/(m²·K), and the other required performance entries meet the specification.

If the ordered dimensions fall within documented assessment coverage, the glazing and hardware match, FPC traceability is available, and the importer and CE fields are complete, the package supports acceptance against those agreed checks. The thermal value is 0.1 W/(m²·K) below the project ceiling.

Now change the delivery to a sliding sash while the declaration still identifies the tilt-turn type. Hold acceptance and obtain coverage for the supplied construction, together with the corresponding declaration and marking information. If the corrected Uw is 1.8 W/(m²·K), it exceeds the ceiling by 0.4 W/(m²·K), so a revised configuration is needed before release.

If the construction and performance match but the importer’s contact address is missing, complete the identification before market placement. Keep the correction attached to the delivery reference. The party importing the windows remains responsible for the Article 13 checks. CPR 2011, Article 13

FAQ

Is a laboratory report enough to release an EU window order?

A System 3 report supports type assessment. The order package also needs the manufacturer’s DoP, CE information, production control and identification matched to the supplied window.

How long should the compliance records remain accessible?

Under CPR 2011 Article 11(2), manufacturers keep the technical documentation and DoP for 10 years after the construction product has been placed on the market. Article 13(8) requires the importer to keep a DoP copy and ensure the technical documentation is available to authorities for that period. CPR 2011, Articles 11 and 13

What should a factory identify when replacing a legacy DoP?

For a change proposed after 8 January 2026, identify the new-framework coverage supporting the DoPC route. The transition preserves legacy procedures for products still covered by legacy specifications.

HAVE A PROJECT SCHEDULE?

Let YULUX review your drawings before pricing.

Send us your window schedule, floor plans or photos. We review opening sizes, system direction, glass, hardware, finish and packing scope before quoting.

Continue planning your window and door project

Dimensions, loads and building standards

Get a Quote

Share your window schedule, architectural drawings, opening sizes or a project brief. We'll reply with system, glass, hardware, finish and export packing recommendations.

YULUX chat

AI assistant · Human support
⋯

AI guidance only; our team confirms pricing. ·

I am an AI, not a person. Share non-sensitive project needs only. Answers and search sources need verification; I cannot confirm pricing, agency status or contracts. The temporary session is kept in this browser tab and server memory, and clears after 30 minutes of inactivity. Privacy policy

Hi, I’m YULUX’s AI assistant. Ask about products, window and door systems, or partnership.