Hong Kong Window Regulations for Imported Aluminium Window Orders

Hong Kong window regulations for buyers:MWIS notices,APP116 design responsibility,hinge repairs and a local-versus-import procurement comparison.

Closely spaced aluminium casement windows on a dense coastal apartment facade.
Answer in brief

Hong Kong Window Regulations for Imported Aluminium Window Orders

Hong Kong's MWIS applies to notified buildings aged at least 10 years, with domestic buildings of 3 storeys or fewer excluded. Owners served with a notice appoint a Qualified Person for inspection and supervision of necessary prescribed repairs. Choose the supply and installation scope from those findings for a notified repair, or from the design for new or replacement work.

1. Is the Hong Kong order new work, replacement or a notified inspection?

The Buildings Department's MWIS overview requires the owner of a covered, notified building to appoint a Qualified Person for inspection and supervision. A registered contractor carries out the necessary prescribed repairs.

For a purchase, put the work category on the opening schedule before selecting a supplier. A new development needs its design and construction responsibilities allocated. A replacement project needs the existing opening, supporting substrate and local works procedure resolved. A notified inspection starts with the Qualified Person’s findings, which may lead to repair rather than complete replacement.

Choose the Hong Kong work route before ordering. New work: Use the project’s design and approval route for the actual openings.; Replacement: Identify the replacement scope on the opening schedule before selecting a supplier.; MWIS notice: After a statutory notice, the owner appoints a Qualified Person; a registered contractor carries out prescribed repairs..
IMAGE NOTE

Choose the Hong Kong work route before ordering

2. What should match between the local and imported quotations?

Use the same finished frame size, opening direction, glazing build-up, finish and hardware arrangement for both quotations. Keep any cheaper alternative on a separate line. Where a Hong Kong fabricator includes survey and installation, show their scope beside the corresponding separately appointed work on a direct-import offer.

The window-schedule guide connects the opening marks to dimensions and handing. Add the surrounding wall section and accessible fixing positions before manufacturing. A replacement frame selected solely from the visible trim dimensions can leave its fixing and sealing work unresolved.

3. Which APP-116 requirements belong on the fabrication drawing?

For the accepted APP-116 detail, stainless-steel or hot-dip-galvanised fixing lugs have a minimum material thickness of 1.5 mm. Carry the actual lug material and attachment into the drawing rather than describing the perimeter fixing as an unspecified site item.

The official APP-116 practice note sets out a route accepted by the Building Authority, with departures requiring separate substantiation. It also routes large-window structural submissions through APP-37 and assigns appropriate design and installation responsibilities for other windows. The local design team selects the route for the actual opening.

The fixing substrate and load path should be settled before frame production. Mark where the factory supplies reinforcement or prepared attachment positions, and where the installer supplies anchorage into the wall. Keep glass support, sash operation and drainage accessible after the fixing arrangement is completed.

Use the frame-to-opening measurement guide to record the actual wall and frame datums. The project’s accepted dimensions and fixing details should carry through drawing revision, production label and delivered opening mark. Resolve a changed substrate or enlarged opening with the design team before treating it as a repeat unit.

Translate the accepted APP-116 fixing detail into a drawing. Lug material: For this detail, specify stainless steel or hot-dip galvanised steel, minimum thickness 1.5 mm.; Frame and wall: Mark factory attachment points, installer anchorage and the actual fixing substrate.; Change control: Send changed substrates or enlarged openings back to the local design team..
IMAGE NOTE

Translate the accepted APP-116 fixing detail into a drawing

4. What does the Chinese-language repair guidance add to the order?

When a hinge is replaced, at least 3 rivets or screws are required by the Buildings Department’s Chinese-language window maintenance guidance. It also requires stainless-steel fixings when fitting a stainless-steel hinge or replacing the fixings of an existing stainless-steel hinge. Specify the replacement assembly and attachment together. A replacement hinge held by only two screws falls below that minimum fixing count.

For a covered building aged 10 years or above and served with an MWIS notice, the same guidance requires prescribed repairs to reach a standard no lower than the original design and excludes weather-seal components that do not affect safety from the MWIS prescribed inspection and repair scope. Price any separately required water-sealing work as its own item so the owner can distinguish the statutory safety repair from the additional refurbishment.

A replacement-parts order should carry the original opening mark, hinge arrangement and the local repair specification. Photographs can identify the location, while the responsible local person determines the repair and its attachment. A visually similar handle or hinge can have different fixing centres or operating geometry.

5. How should delivery and installation be scheduled?

Keep the building’s access and receiving arrangement beside the packed dimensions. The largest glazed frame has to pass the unloading and movement route. A contractor working in occupied premises also needs a sequence that keeps the opening protected while the existing window is removed and the replacement is fitted.

List goods value, transport and handling against the quoted delivery term, then add any separately contracted local survey, design, installation and inspection. Count a charge once when it is already included in the supplier’s offer. Keep the owner’s notified repair scope visible if it is being combined with a wider replacement programme.

At receipt, match the delivered opening marks with the installation sequence and check that the selected fixings, reinforcement and service parts travel with the correct units. Keep the local installer’s contact and the accepted drawing revision available to the receiving team before crates are distributed.

FAQ

Does every Hong Kong building become subject to MWIS at 10 years?

10 years is the age threshold for the covered buildings, excluding domestic buildings of 3 storeys or fewer; the MWIS duty described by BD also requires service of a statutory notice.

What fixing-lug thickness does the accepted APP-116 detail specify?

1.5 mm is the minimum material thickness for stainless-steel or hot-dip-galvanised fixing lugs under the accepted APP-116 detail.

How many fixings does BD require when replacing a window hinge?

At least 3 rivets or screws are required when replacing a hinge; stainless-steel fixings are required when fitting a stainless-steel hinge or replacing its existing fixings.

HAVE A PROJECT SCHEDULE?

Let YULUX review your drawings before pricing.

Send us your window schedule, floor plans or photos. We review opening sizes, system direction, glass, hardware, finish and packing scope before quoting.

Continue planning your window and door project

Dimensions, loads and building standards

Get a Quote

Share your window schedule, architectural drawings, opening sizes or a project brief. We'll reply with system, glass, hardware, finish and export packing recommendations.

YULUX chat

AI assistant · Human support
⋯

AI guidance only; our team confirms pricing. ·

I am an AI, not a person. Share non-sensitive project needs only. Answers and search sources need verification; I cannot confirm pricing, agency status or contracts. The temporary session is kept in this browser tab and server memory, and clears after 30 minutes of inactivity. Privacy policy

Hi, I’m YULUX’s AI assistant. Ask about products, window and door systems, or partnership.