Replacement window frame size vs. rough opening
Always state the manufactured frame size separately from the rough opening. On Marvin's measuring sheet, covered windows are built 1 inch narrower than the rough-opening width and 1/2 inch shorter than the height. That difference is system-specific, which is why width and height deductions must be written out independently on every replacement order.
Match the dimension to the installation method
| Installation or task | Use | Consequence |
|---|---|---|
| Old frame remains | Clear pocket inside the retained frame | The insert must pass through the narrowest measured location |
| Old frame is removed | Exposed structural opening | Allow for the new frame's fixing, sealing and flashing detail |
| Placing the manufacturing order | Explicit overall frame width and height | Show any deduction separately so it is applied once |
| Comparing visible glass | Daylight dimension | Useful for sightlines, with frame dimensions specified separately |
Keep the raw readings
In the supplied measurement example, opening widths of 1510, 1504 and 1508 mm give a minimum of 1504 mm and a spread of 6 mm. Heights of 1212 and 1206 mm give a minimum of 1206 mm. This is an illustrative site note.
Log each measurement against its exact tape position. Never average the widths—you will end up with a unit wider than the tightest pinch point in the opening.
Label the surfaces touched by the tape
The rough opening is the clear aperture left once demolition is defined. The existing frame's outside dimension gives you the current unit size, while the retained-frame pocket tells you the clear space left for an insert replacement.
Log jamb depth separately from width and height. Note any sill slope and mark your exact bottom datum for the height pull. Daylight glass dimensions only tell you the visible pane size inside the sash profile.
Survey the opening for the chosen removal scope
For insert installations, take multiple readings inside the existing frame pocket and pull diagonals to check for rack. For full tear-outs, pull back enough trim or liner to see the actual structural opening and check the substrate for rot or spalling.
Highlight the tightest width and height alongside your other pulls, diagonal checks, and sill level readings. The site crew needs all of them to pack the frame plumb and square while holding the required perimeter joint clearances.
Apply an allowance once
Work from a dimensioned installation detail for the chosen profile series. Break out the site opening, total width and height deductions, and net manufacturing frame size on separate lines.
The Marvin worksheet shows how width and height deductions differ within one product line. Applying those same clearances to another framing system will throw off your perimeter fixing and sealant joints. Tie your final manufacturing sizes to the exact drawing revision of the approved installation detail. Marvin