Product views




Series and specifications
| Series | Specifications and configuration |
|---|---|
| YD-260 coping |
|
| YD-350 coping |
|
| YD-DZ-01 connector |
|
| Upper drip trim |
|
| Lower square drip trim |
|
| Light-channel drip trim |
|
| YD-260 |
|
| YD-350 |
|
Prepare your inquiry
- Opening sizes, quantities and project location
- Opening layout, glass, finish and hardware requirements
- Drawings, window schedule and site photographs
Frequently asked questions
How is lead time confirmed?
Lead time depends on order quantity and configuration, and is confirmed with your quotation.
Which coping widths are documented?
YD-260 and YD-350 indicate 260 and 350 mm overall widths. Measure the wall top over the completed cladding or external insulation.
Is YD-DZ-01 a 145 mm coping profile?
No. YD-DZ-01 is the 145 mm splice connector used between coping lengths, ordered separately from the main coping extrusion.
What drip-trim options are available?
Select the upper drip, lower square drip, or light-channel drip based on its location in the opening. The light-channel profile includes a dedicated recess for LED strips.
Do coping runs require separate end caps?
Yes. Tally end caps for all termination points and splice connectors for running joints. Mark all corners and straight runs on the parapet layout.
Is wall width enough to specify the right profile?
Not by itself. Confirm the finished wall thickness and required overhang first, then verify corners, joints, fixing points, and the drip projection on your section drawing.