Part L Window U Value in England: Replacement, New Build and 2027 Dates

Use England’s 2021 Part L guidance with 2023 amendments: compare replacement and new-dwelling windows, averaging conditions, character options and 2027 dates.

A deep window reveal in a warm plastered room overlooking brick terrace houses.
Answer in brief

Part L Window U Value in England: Replacement, New Build and 2027 Dates

In England's Approved Document L Volume 1, 2021 edition incorporating 2023 amendments, replacement windows in existing dwellings use 1.4 W/(m²K) or minimum WER Band B, with the no-worse replacement condition. New dwellings have a 1.6 W/(m²K) window limiting value subject to Table 4.1's area-weighting rules and the whole-dwelling targets. Official Tables 4.1 and 4.2

Are you replacing a window or designing a new dwelling?

For existing dwellings, Table 4.2 of Approved Document L Volume 1, 2021 edition with 2023 amendments gives the window route as 1.4 W/(m²K) or minimum WER Band B. Paragraph 4.8 also requires replacement performance to be no worse than the element being replaced. An apparently compliant catalogue option can therefore be unsuitable when the existing element performs better.

New dwellings use Table 4.1, whose window backstop is 1.6 W/(m²K) and whose note 1 specifies area-weighted average values. The table’s other notes and the dwelling’s overall performance targets also apply.

Table 4.1 uses area-weighted average values, while Table 4.2 excludes windows, doors, roof windows and rooflights from its area-weighted rule. Assess the replacement window against its applicable route and the no-worse requirement, with each opening identified in the schedule.

Purchase decisionBenchmark, W/(m²K) unless WERWhat the order must match
Replacement in an existing home1.4 or WER Band BWindow exception to area weighting and no-worse replacement performance
Window in a new dwelling1.6 limiting valueTable 4.1 area-weighting provisions, notes and whole-dwelling energy model
2021 notional window specification1.2 reference inputTarget-setting reference. The actual design can differ within its requirements

When can the current character-preservation option apply?

Under current paragraph 4.10, windows or fully glazed external pedestrian doors that cannot meet Table 4.2 because building character must be maintained can use a centre-pane U value no greater than 1.2 W/(m²K), or single glazing supplemented by low-emissivity secondary glazing.

This option already appears in the 2021 guidance incorporating 2023 amendments. Record why the normal table cannot be met and which stated alternative the project uses. The centre-pane assessment and the reference dwelling’s whole-window specification cover different areas and serve different decisions.

Choose the England dwelling route
IMAGE NOTE

Separate the building category, applicable edition and performance purpose.

Which edition belongs to the project programme?

Programme positionDocument or dateProject consequence
Current England dwelling guidance2021 edition with 2023 amendmentsSelect existing-home or new-dwelling route
Ordinary-work changeover24 March 2027Check submission and commencement protection
Specified higher-risk work changeover24 September 2027Use the separate HRB transition provisions

Why does the 2021 notional dwelling use 1.2?

Table 1.1 of the 2021 notional-dwelling specification sets a window U value of 1.2 W/(m²K). It is a reference-building input for setting whole-dwelling targets, rather than a replacement-window limit or a universal order instruction. Paragraph 2.3 allows the actual design to differ from the reference specification while meeting the building targets and other requirements.

Keep the selected whole-window value next to the window type and the corresponding energy-model input. A tilt-and-turn window and a fixed light can have different frame proportions and opening configurations even with the same insulated glass specification.

Which dates protect an ordinary project during transition?

MHCLG Circular 01/2026 separates the general changeover from the higher-risk building arrangements. For ordinary non-HRB work, its transition route requires the relevant notice or application before 24 March 2027 and defined commencement for the individual building before 24 March 2028. Commencement has the regulatory meaning set out for the work, rather than simply a window order, deposit or site delivery.

Paragraph 23 treats buildings within a multi-building development separately. Progress on an early block does not automatically settle the transition position of every later block. Connect the procurement release to the building covered by the submission and commencement record.

The HRB route instead uses the separate valid-application provisions before 24 September 2027, including rejection and staged-application conditions. Apply those paragraphs to the relevant HRB work rather than importing the ordinary-work commencement deadline into that route.

Keep glass and whole-window assessment distinct
IMAGE NOTE

Carry the evaluated configuration into the project energy model.

How will the revised methods change a future window schedule?

The September-revised 2026 Approved Document L Volume 1 describes whole-window assessment in paragraph 3.1. For new dwellings, paragraphs 3.2–3.3 use hot-box measurement or calculation for the actual window size and configuration. Frames, sills, add-ons, dummy sashes, transoms and couplings belong within the specified assessment scope.

The Circular 04/2026 correction schedule explicitly covers paragraphs 3.4b/c and Table 3.1, among other corrections. The September document therefore matters when preparing a future specification. Its publication does not move the applicable commencement dates into 2026.

For existing dwellings, paragraph 3.4 retains defined alternatives involving actual-size or specified standard-window calculations, hot-box methods and listed defaults. The new-dwelling actual-configuration wording should not erase those separate options. Keep the method identified alongside the resulting value.

The 2026 text retains a character-preservation option in paragraph 3.11, linked to paragraph 0.9, where Table 3.2 cannot be met. Its centre-pane 1.2 W/(m²K) or Low-E secondary-glazing route belongs to that future edition’s conditions. The current paragraph 4.10 remains the relevant starting point for a project using the 2021 amended guidance.

How should U value and WER enter the purchase description?

A U value addresses thermal transmittance. WER is an energy-rating route, so the Band B option is not a numerical conversion to a particular U value. On a replacement schedule, identify which permitted route supports the chosen window rather than presenting both labels as interchangeable measurements.

The U value, SHGC and Low-E explanation helps separate glass properties from the complete opening. Pair it with the thermal-performance guide when comparing frame and glazing combinations. A glass-only result leaves frame effects and the glazed edge outside its stated scope. CTC's Chinese Low-E insulating-glass sampling table specifies one 300 × 300 mm glass specimen for thermal transmittance, shading coefficient and visible-light transmittance tests.

Which window would you release against the energy model?

Select the required whole-window performance and assessment method together, then retain the exact frame and glazing configuration in production drawings. When changing the opening style, mullion arrangement or coupling, revisit the represented configuration before relying on the previous result. The thermal-break strip-width guide offers a related component discussion for that comparison.

FAQ

Does WER Band B translate to exactly 1.4 W/(m²K)?

The existing-dwelling table provides 1.4 W/(m²K) or WER Band B as alternative routes. A WER band is an energy classification, so it should not be relabelled as an identical numerical thermal-transmittance result.

Does publication of the 2026 document change an ordinary project during 2026?

The ordinary-work effective date is 24 March 2027, with transition protection subject to the submission and defined-commencement conditions. The separate specified HRB date is 24 September 2027.

Can a centre-pane 1.2 figure replace the scheduled whole-window value?

Current paragraph 4.10 permits a centre-pane value no greater than 1.2 W/(m²K), or the stated Low-E secondary-glazing alternative, when maintaining building character prevents compliance with Table 4.2. The 2021 notional whole-window 1.2 value separately supports reference-building target setting.

HAVE A PROJECT SCHEDULE?

Let YULUX review your drawings before pricing.

Send us your window schedule, floor plans or photos. We review opening sizes, system direction, glass, hardware, finish and packing scope before quoting.

Continue planning your window and door project

Dimensions, loads and building standards

Get a Quote

Share your window schedule, architectural drawings, opening sizes or a project brief. We'll reply with system, glass, hardware, finish and export packing recommendations.

YULUX chat

AI assistant · Human support
⋯

AI guidance only; our team confirms pricing. ·

I am an AI, not a person. Share non-sensitive project needs only. Answers and search sources need verification; I cannot confirm pricing, agency status or contracts. The temporary session is kept in this browser tab and server memory, and clears after 30 minutes of inactivity. Privacy policy

Hi, I’m YULUX’s AI assistant. Ask about products, window and door systems, or partnership.