SASO Windows Saudi Arabia — Import and SABER Planning
For Saudi window imports, register the applicable product through SABER and obtain the consignment documentation for the goods dispatched. SABER's standard importer product-certificate service lists validity of 1 year and an administrative service period of 5–6 working days after the required evidence is prepared. Laboratory testing and corrective work need additional time. SABER importer product-certificate service
Which SASO requirements apply to an aluminum window order?
The SASO doors, windows and accessories regulation, first edition amendment 1, separates fire-resistant and other covered products into different conformity routes. Its amendment was published in the official gazette on 9 June 2023. SASO regulation
Classify the goods actually supplied as completed glazed windows, bare profiles or separately sold accessories. Use Annexes 1A/1B and the current SABER approved product and tariff entries to assign the conformity route through a SASO-accepted body.
Covered fire-resistant doors and windows follow Type 3 under Article 6.1; the other covered products follow Type 1a under Article 6.2.
Article 6.4 requires the manufacturer/importer’s supplier declaration of conformity and a risk-assessment file. Annex 1A item 7 cites SASO-1033 for aluminum windows; that citation identifies a referenced standard, rather than supplying its detailed test limits. The official application guide accompanies the regulation.
Two Saudi conformity routes for covered products
How do PCoC and SCoC affect the purchase schedule?
The importer obtains a Product Certificate of Conformity (PCoC), valid for 1 year under SABER's standard importer service, for the covered models and a Shipment Certificate of Conformity (SCoC) identifying each dispatched batch, including repeat deliveries.
SASO’s announcement of 26 August 2025 requires a consignment certificate before submitting an import customs declaration from 1 October 2025, for imported products whether technically regulated or not. Prepare the relevant conformity documents or self-declarations through SABER before shipment. Saudi Press Agency announcement
SASO describes a consignment certificate as covering an identifiable quantity, traceable through a serial number, batch number or production date. This makes traceability a practical loading decision. Mixed crates need a packing map that still identifies their contents after unloading. SASO consignment certificate definition
Place the SABER product service on the schedule
What changes when the frame, thermal break or glass changes?
A construction change can affect both project performance and certificate validity. Under Article 10.8, a product modification other than an appearance-only change during the validity of its certificate or quality-mark licence invalidates that document and requires a new application. Treat a different glass build-up or profile as a reviewable change before production. SASO modification rule
Thermal-break wording alone leaves the buyer without a whole-window performance target. Put the required whole-window thermal result and solar-control criterion in the project specification, alongside the calculation or test basis. The frame section and glazing must support the ordered assembly. Whole-window U-value and solar-gain guide
Who does what between quotation and shipment?
SABER also accepts registration of an existing SASO-issued certificate using its number and issue/expiry dates. That service's validity follows the certificate type. Use this route when the existing certificate covers the product. SABER existing-certificate service
How should a split order be handled?
A developer may release the main windows first and hold an entrance assembly for later approval. Keep the later delivery visible in the order programme, with its product coverage, shipment paperwork and freight allocation. The first release should contain only the goods represented in its dispatch records.
If spare glazing travels with the main order, describe it separately in the packing information. If it travels later, carry its identity into the later consignment. This makes damage reconciliation easier and prevents the factory’s complete project list being mistaken for the contents of a partial dispatch.
FAQ
Does SABER certification mean a window carries the Saudi Quality Mark?
The Saudi Quality Mark has its own assessment and licensing scheme. The October 2021 Chinese briefing describes product testing, factory-system assessment and subsequent surveillance for that mark. Name the actual certificate or license in the purchase contract and verify its coverage. MOFCOM-hosted explanation of SQM
Can every window size use the same product certificate?
Coverage must match the registered product and its accepted technical file. SABER requests model numbers during registration. Establish the accepted family and configuration coverage with the CAB before costing a mixed-size order. SABER model-number requirements
What should a buyer send for a Saudi window quotation?
A quotation for a split order must price the later delivery's conformity and freight work separately. The first consignment certificate covers the identified goods in its dispatched batch. An existing SASO-issued certificate may use SABER's separate registration route where its coverage matches. SABER existing-certificate registration
Let YULUX review your drawings before pricing.
Send us your window schedule, floor plans or photos. We review opening sizes, system direction, glass, hardware, finish and packing scope before quoting.