Dubai Green Building Regulations for Windows under Al Sa’fat 2023
For Dubai Silver Sa'fa glazing below 40% window-to-wall ratio, Al Sa'fat's January 2023 tables set summer U-value at no more than 2.1 W/(m²·K), shading coefficient at no more than 0.40 and light transmittance at no less than 0.40. Select the area band and tier before pricing the window assembly. Al Sa'fat, Tables 501.01(2)–(4)
Dubai glazing numbers by area and rating
| Window/wall area (%) | Silver U max (W/m²K) | Silver SC max | Silver LT min | Golden/Platinum U max (W/m²K) | Golden/Platinum SC max | Golden/Platinum LT min |
|---|---|---|---|---|---|---|
| <40 | 2.1 | 0.40 | 0.40 | 1.9 | 0.32 | 0.32 |
| 40–60 | 1.9 | 0.32 | 0.32 | 1.7 | 0.25 | 0.25 |
| >60 | 1.7 | 0.25 | 0.25 | 1.5 | 0.25 | 0.25 |
Which edition applies to a new Dubai window specification?
Dubai Municipality identifies Al Sa’fat, second edition, January 2023, as its current downloadable system. Its official introduction dates the replacement of the earlier Green Building Regulations and Specifications to 19 October 2020. Silver is the mandatory baseline for new buildings, with Golden and Platinum providing higher tiers. Name the edition and intended tier on the project specification.
Al Sa’fat 501.01B sets the glazing bands in Tables 501.01(2)–(4). Read the clauses alongside Dubai Building Code 2021, Part E, and the villa provisions in Part K where applicable. The middle table band includes 40%, so a design at that boundary needs the corresponding performance row.
How much glazing is allowed on a Dubai building?
Al Sa’fat 501.01B7 caps total glazed-façade WWR for conditioned spaces at 40% for residential buildings and 60% for other building types, with a shopfront exception.
Apply B7 alongside the performance table. A listed row above 60% establishes thermal criteria for that row, while the permitted area still requires its applicable approval route. Dubai Building Code E.5.1 also describes a performance-method comparison against a reference building. The designer resolves any departure through that route before procurement.
Under DBC E.5.2.2, Table E.3, elevation limits vary with direction, including 80% north and 40% south. The project must reconcile these with its overall WWR. Al Sa’fat’s cited performance tables use SC bands organised by glazing area.
For an illustrative 200 m² gross exterior wall, 70 m² of glazing gives 35% WWR. Adding a 12 m² opening raises glazing to 82 m² and WWR to 41%, crossing the performance band and the residential total-area limit.
Dubai glazed-façade limits for conditioned spaces
Does Low-E glass alone deliver the whole-window U-value?
The DM U-value calculation and glazed schedule support evaluation of the selected assembly. Glass, aluminium framing and the glass-edge connection contribute to heat transfer. Changing the sash layout changes their proportions.
A wider frame, an added opening sash or a changed spacer alters the assembly calculation through its frame proportion and glass-edge connection. Recalculate those changes against the applicable Sa'fa row. Low-E glazing still requires a whole-window assessment against Silver's below-40% WWR limits of summer U-value ≤2.1 W/(m²·K), SC ≤0.40 and light transmittance ≥0.40.
Use SC where the Dubai table specifies shading coefficient. An overseas SHGC entry must retain its own label when imported into the glazing schedule.
How should a Chinese insulating-glass description be written?
The Chinese 23BJ13-5 glazing atlas defines A as air and Ar as argon. A 5+20A+5 description identifies two 5 mm panes around a 20 mm air cavity, giving a nominal thickness of 30 mm, about 1.18 in.
Match the IGU thickness to the frame’s glazing pocket, beads and gaskets. Compare glass samples for colour and reflected appearance when adjacent elevations need a consistent finish. Pane thickness and treatment also follow panel dimensions, support and safety requirements.
Decode 5 + 20A + 5 in a glass quotation
Does imported glass need Dubai Municipality certification?
Dubai Municipality lists glazed glass under mandatory factory assessment. The scheme assesses factory quality management and product conformity, followed by surveillance.
The current DCL glazed-glass certification rule, document DM-DCLD-RD-CQP-2192, was first issued on 9 August 2016 and is revision 08, updated 18 September 2026. It applies to glazed elements under Al Sa’fat 501.01B and DBC E.5.2.3.2 and K.7.2.2.2. The manufacturer/applicant submits glass identification, a technical data sheet for each type and its exposure area.
The DM factory-assessment process issues the Product Conformity Certificate and permission to use the conformity mark to the applicant after satisfactory factory assessment and product evaluation. The certificate covers the assessed product and holder; the glass purchase schedule identifies that holder and covered product code.
Which regional requirements affect a Dubai window package?
Decree No. 45 of 2021, Articles 1 and 3–6 applies the DBC across Dubai, including special development zones and free zones. Licensing and implementation involve the competent entity responsible for construction works in that area.
What should a Dubai glazing option price include?
| Quotation item | Specified content |
|---|---|
| Assembly | Dimensions, sash layout, frame and finish |
| Glass | IGU build-up, coating, treatment, gas and spacer |
| Performance | Whole-window U-value, SC, light transmittance and calculation basis |
| Conformity | Product identification, certification scope and technical sheets |
| Delivery and installation | Freight, handling, fixing, sealing and access |
FAQ
What is the Dubai Silver Sa’fa window U-value below 40% glazing?
The January 2023 Al Sa’fat table sets a maximum summer U-value of 2.1 W/(m²·K), alongside SC≤0.40 and light transmittance≥0.40 for that band.
Can a villa use 60% glazing by buying better glass?
Al Sa’fat 501.01B7 sets the residential total WWR limit at 40%. A larger glazing proposal needs its applicable approved design route before ordering.
Does double glazing automatically meet Al Sa’fat?
Double glazing needs the required whole-assembly U-value, solar control and light transmission at the project’s WWR and rating tier. The frame, edge connection and product conformity enter the specification.
Let YULUX review your drawings before pricing.
Send us your window schedule, floor plans or photos. We review opening sizes, system direction, glass, hardware, finish and packing scope before quoting.
