Send the project location, finished-frame widths and heights, opening types, quantities and glass build-up for a villa window quotation. YULUX supplies 55/70/110/120 thermal-break casement series with standard 5+20A+5 double-toughened glass—5 mm glass, 20 mm air, 5 mm glass—from 1 unit, with 50% deposit and 50% before shipment.
How should you compare pricing?
| Price basis | Use it for | Result and trade-off |
|---|---|---|
| Price per complete window | Schedules mixing fixed, casement and sliding units | Shows the full cost of each operating type |
| Price per square metre | Identical frame, glass and accessory specifications | Area-normalised comparison; small-unit minimum charges still affect the total |
| Supply-only price | Product sourcing with freight priced separately | Add packing, freight and destination costs before comparing the purchase total |
What drawings, schedules or sizes can start a quotation?
You can quote from architectural drawings, a window schedule, or a simple width-by-height list. Assign each opening a mark, room, quantity, and swing or slide direction. Specify the measurement unit and clearly distinguish rough wall openings from finished frame dimensions. If you price off rough openings, you will still need to sign off on final frame sizes before fabrication starts.

C marks an operable sash; F marks a fixed light. Match each opening mark to its size, quantity, floor and opening direction.
Open the full-size diagramWhy building type and site location matter
The destination country and city set the climate requirements, shipping route, and local code standards. Note the building type, floor levels, and any coastal exposure. A sheltered ground-floor courtyard window and an exposed upper-floor balcony door require very different wind-load, drainage, and finish specifications.
Which glass, finish and hardware notes should be sent early?
List the glass make-up, frame colour, handle finish, and flyscreen type directly on the schedule. Have the factory break out upgrades like Low-E coatings or laminated glass as separate line items so you can see the exact cost difference.

Profile, glass build-up, seals and thermal breaks should be named in the quote scope instead of left to assumption.
Which delivery and packing details affect the quote?
Provide the site delivery address, target arrival date, trade terms, and how you plan to unload the containers. This dictates freight costs and how the crates are built and loaded. Make sure crate labels match the opening marks on your window schedule.

Packing, labels and unloading access belong in the original inquiry because they affect cost and site handling.
Comparing unit pricing vs. square-metre rates
Compare the total unit price multiplied by quantity, then add separate line items like screens, crating, and freight. When reviewing square-metre quotes, check that the area is calculated from finished frame width times height, and watch for minimum chargeable area rules on small windows.
Have YULUX review your drawings before quoting.
Send your window schedule, floor plans, or site photos. We check structural openings, swing directions, glass specs, hardware load, finishes, and crating requirements before issuing a quote.